Quantity: | |
---|---|
Model | OA-20B |
Capacity | 20 ton |
Minimum Height | 260 mm |
Maximun Height | 510 mm |
Adjusting Height | 80 mm |
Lifting Height | 170 mm |
Net weight | 16 kg |
Gross weight | 17 kg |
Qty/Ctn | 1 pc |
Package size | 290mmX220mmX280mm |
Packing way | neutral color box or customized color box. |
MOQ | 80 pcs |
Loading | Ningbo port or Shanghai port |
Delivery time | 25 days |
Features:
Designed for fast lifting and convenient servicing of vehicles.
Reasonable structure, easy operation, safe and reliable use.
Operates manually or with air.
Safety overload system prevents jack from being used beyond its rated capacity.
Small dimension, large carrying capacity, high-pressure resistance performance.
FAQ:
What basic information you should provide when inquiry?
1. Model
2. Capacity
3. Quantity
Which is merchandise loading port for exporting in China?
From Ningbo or Shanghai port, generally exporting from Ningbo loading port.
What's the universal lead time for order delivery?
In general, it will take 25 days to 30 days after receiving advance deposit payment. The specific delivery time depends on the product and the quantity of your order.
Do you deal with urgent orders?
Sure. Please connect with us ASAP for request details.
Model | OA-20B |
Capacity | 20 ton |
Minimum Height | 260 mm |
Maximun Height | 510 mm |
Adjusting Height | 80 mm |
Lifting Height | 170 mm |
Net weight | 16 kg |
Gross weight | 17 kg |
Qty/Ctn | 1 pc |
Package size | 290mmX220mmX280mm |
Packing way | neutral color box or customized color box. |
MOQ | 80 pcs |
Loading | Ningbo port or Shanghai port |
Delivery time | 25 days |
Features:
Designed for fast lifting and convenient servicing of vehicles.
Reasonable structure, easy operation, safe and reliable use.
Operates manually or with air.
Safety overload system prevents jack from being used beyond its rated capacity.
Small dimension, large carrying capacity, high-pressure resistance performance.
FAQ:
What basic information you should provide when inquiry?
1. Model
2. Capacity
3. Quantity
Which is merchandise loading port for exporting in China?
From Ningbo or Shanghai port, generally exporting from Ningbo loading port.
What's the universal lead time for order delivery?
In general, it will take 25 days to 30 days after receiving advance deposit payment. The specific delivery time depends on the product and the quantity of your order.
Do you deal with urgent orders?
Sure. Please connect with us ASAP for request details.
In principle, the hydraulic jack is based on Pascal principle, that is, the pressure of the liquid is the same everywhere, so in a balanced system, the pressure exerted on the smaller piston is relatively small, and the pressure exerted on the larger piston is also relatively large, which can keep t